MP Transmission losses to be taken for scheduling for the period:-from 03.03.25 to 09.03.25 are 2.63%, 10.03.25 to 16.03.25 are 2.65%, 17.03.25 to 23.03.25 are 2.63%, 24.03.25 to 30.03.25 are 2.65%.