SLDC MP receives Best SLDC Award in the LDC Excellence Award 2022
MPPTCL won IPPAI Power Awards 2019
Visitor Counter
3183
Last Updated on : 30-10-2024
News
MP Transmission losses to be taken for scheduling for the period:-from 28.10.24 to 03.11.24 are 2.72%, 04.11-24 to 10.11.24 are 2.78%, 11.11-24 to 17.11.24 are 2.77%, 18.11-24 to 24.11.24 are 2.74%, 25.11-24 to 01.12.24 are 2.75%.