(Wholly owned by Govt. of Madhya Pradesh)
ISO : 9001 - 2015
Home
About Us
Downloads
Central Acts, Regulations
State Acts, Regulations
CEA Regulations
Other Acts, Regulations
First Time Charging Documents
LIST OF IMP GRID ELEMENTS
Planned Outage Procedure
SLDC Operating Procedure
RTI
Related Links
Tenders
Contact Us
Feedback
Menu
Open Access
Scheduling
New Scheduling w.e.f 01/02/2019
Declared Capacity
Entitlements
Requisitions
Injection Schedule
Drawal Schedule
Inter-State/Intra-State STOA
Discom Surplus Schedule
ISGS Surplus
Estimated Losses
Mirror Site for Scheduling
Meetings
Intra-State OCC Meetings
State Level Relay Setting Review Committee Meeting
Commercial
State Energy Account
DSM Account
Wind & Solar DSM
REC Account
Discom Share Allocation
Mirror Site for Commercial
Meter Interface Report
UI Pool Account
RFC Pool Account
SEM Data
OAC SCHEDULED DRAWAL REPORTS: DATE WISE
OAC SCHEDULED DRAWAL REPORTS: BLOCK WISE
DISCOM DRAWAL REPORT : MONTH-WISE
Weather
RE Generator INFO
Regulatory Requirements
Registration Form
Telemetry Guidelines
ABT Meter Details Format
Forecasting Format
One Time Info Format
REMC Format
LVRT Format
PTCC Format
QCA Registration Form
TRANSFER CAPABILITY
Approved S/D
Approved S/D for tomorrow
WRPC Approved S/D for next month
Eltrix Portal
REMC
RE Curtailment
CPP Verification
REQUIRED DETAILS
ANNEXURES
Procedure
Monthly MOD
Photo Gallery
Inauguration of workshop
Shri Rajesh Gupta, SE(LD:E&T) receiving SKOCH Award
SLDC MP receives Best SLDC Award in the LDC Excellence Award
3rd Meeting of the Sub group on Reserves and Ancillary Services at State Level at SLDC MP
sldc
Visitor Counter
746
Last Updated on : 21-11-2024
Downloads - State Acts, Regulations
MP Vidyut Sudhar Adhiniyam 2000
MP Electricity Grid Code 2024 (English)
Interstate Open Access Regulation 2005
Discussion Paper for Implementation of ABT in MP
Balancing and Settlement Code - English
Balancing and Settlement Code - हिंदी
Levy & Collection of Fees and Charges by SLDC Regulation, Revision-1, 2006 (RG16 of 2006)
Guidelines for RE Generators to ensure before connecting with the Grid
Minutes of Meeting on 24.09.2015 with RE Generators/Developres
MPERC(Forecasting, Scheduling, DSM & related matters of Wind & Solar Generating Stations) Regulations 2018
First Amendment to MPERC (Forecasting, Scheduling, DSM & related matters of Wind & Solar Generating Stations) Regulations 2018
MPERC Regulations (Verification of captive generating plants and captive users) Regulations
Detailed procedure for verification of status of Captive Generating Plants and Captive Users
DRAFT OPERATING PROCEDURE OF MP
MP Electricity Grid Code 2024 (Hindi)
Login
Username :
Password :
News
DSM Account for the weeks from 01.07.2024 to 28.07.2024 has been issued on
...
more
DSM Account for the weeks from 27.05.2024 to 30.06.2024 has been issued on
...
more
Provisional State Energy Account for the month of October- 2024
...
more
MP Transmission losses to be taken for scheduling for the period:-from 28.10.24
...
more
REC Account for the week 22.04.2024 to 02.06.2024 has been
...
more
Revised R-1 State Energy Account for the month of April- 2024
...
more
The Scheduled energy of Heidelberg Cement India Ltd & Imlai Grinding Units
...
more
Regarding verification of captive status of Captive Generation Plants & Captive users
...
more
REG DSM (Solar/Wind) Account for the weeks from 01.01.2024 to 28.01.2024
...
more
90th Operation & Coordination Committee Meeting of MP
...
more
Revised R-1 DSM Account for the week 21.08.2023 to 24.09.2023 has been issued on
...
more
Withdrawal of Corrigendum Arya energy and Biobijlee green power
...
more
Madhya Pradesh Electricity Balancing and Settlement Code, 2023
...
more
Madhya Pradesh SLDC receives the best SLDC Award in the LDC Excellence Award 2022
...
more
MINUTES OF 2ND SPC MEETING
...
more
State Commission has notified the First Amendment to MPERC (Forecasting, Scheduling,
...
more
SLDC bags Order of Merit SKOCH Governance Award
...
more
SLDC acquired ISO certification 27001:2013 & ISO certification 9001:2015
...
more